BIM & Integrated Project Delivery

 

Industry-Leading BIM & Integrated Project Delivery (IPD)

 

  • State-of-the-art Engineering
  • BIM and CAD Expertise
  • Integrated Project Delivery
  • Comprehensive Project Review

Our fully-staffed CAD department provides Autodesk expertise including AutoCAD, AutoCAD MEP, Navisworks, and Revit MEP. The BIM team designs input into the model for use in clash detection as well as collaboration and production of coordination drawings. These programs are used to collaborate with vendors and subcontractors to produce required project shop drawings. The drawings are then used in the layout of conduit and raceway systems, deck layouts, and prefabrication of common assemblies, all tying into the Trimble Total Station for digital field layout. Autodesk Buzzsaw software is used for documentation control and distribution of files to clients/subcontractors.

Long recognized for design/build proficiency such as our award-winning work at Rosen Shingle Creek Resort, Tri-City develops partnerships and mutual trust through a team effort to deliver lower construction costs, aggressive schedules, and fully achieve project goals.

As a result, Tri-City has proudly provided 3D Coordination/BIM on numerous high-profile projects including:

  • Adventist Health Systems Headquarters (3D Coordination/BIM)
  • Darden Support Center (Conduit racks in 3D)
  • Dr. Phillips Center for the Performing Arts (3D Coordination/BIM)
  • Dr. P. Phillips Hospital Bed Tower Expansion at Sand Lake Hospital (Conduit racks and cable tray in 3D)
  • Duval County Courthouse (3D Coordination/BIM)
  • Florida Hospital Altamonte Springs Surgery Build-out (Conduit racks and cable tray in 3D)
  • Florida Hospital Celebration Expansion (Conduit racks and cable tray in 3D)
  • Florida Hospital Health Village Diabetes Center (3D Coordination/BIM)
  • Florida Hospital Health Village MOB (Conduit racks in 3D)
  • Florida Hospital Health Village PEDS Surgery (Conduit racks in 3D)
  • Florida Hospital Memorial Division MOB (Conduit racks and cable tray in 3D)
  • Florida Hospital Nutritional Services Renovation (3D Coordination/BIM)
  • Florida Hospital Translational Research Institute (3D Coordination/BIM)
  • Marriott Oceana Palms, Phase 2 (Conduit racks in 3D)
  • NCCER Headquarters (3D Coordination/BIM)
  • OCPS Edgewater High School (Conduit racks and cable tray in 3D)
  • OCPS Sessions Middle School (3D Coordination/BIM)
  • Orlando Events Center (Conduit racks and cable tray in 3D)
  • Orlando VA Hospital Bid Pack #2 (Conduit racks and cable tray in 3D)
  • Project 2011-1 (3D Coordination/BIM)
  • St. Petersburg College Remodel/Renovation (3D Coordination/BIM)
  • VAMC Hospital Gainesville (3D Coordination/BIM)
  • WDI Golden Oaks Clubhouse (3D Coordination/BIM)

To learn how Tri-City can turn on the power for you, please contact
Robert Kissick, Business Development, via email or at (407) 788-3500.